NCM-MCI Exam Questions & Answers

Exam Code: NCM-MCI

Exam Name: Nutanix Certified Master - Multicloud Infrastructure

Updated: May 03, 2024

Q&As: 107

At Passcerty.com, we pride ourselves on the comprehensive nature of our NCM-MCI exam dumps, designed meticulously to encompass all key topics and nuances you might encounter during the real examination. Regular updates are a cornerstone of our service, ensuring that our dedicated users always have their hands on the most recent and relevant Q&A dumps. Behind every meticulously curated question and answer lies the hard work of our seasoned team of experts, who bring years of experience and knowledge into crafting these premium materials. And while we are invested in offering top-notch content, we also believe in empowering our community. As a token of our commitment to your success, we're delighted to offer a substantial portion of our resources for free practice. We invite you to make the most of the following content, and wish you every success in your endeavors.


Download Free Nutanix NCM-MCI Demo

Experience Passcerty.com exam material in PDF version.
Simply submit your e-mail address below to get started with our PDF real exam demo of your Nutanix NCM-MCI exam.

Instant download
Latest update demo according to real exam

*Email Address

* Our demo shows only a few questions from your selected exam for evaluating purposes

Free Nutanix NCM-MCI Dumps

Practice These Free Questions and Answers to Pass the Nutanix Certified Master(NCM) Exam

Questions 1

An administrator is responsible for the following Nutanix Enterprise Cloud environment:

1.

A central datacenter with a 20-node cluster with 1.5PB of storage

2.

Five remote sites each with a 4-node cluster with 200TB storage

The remote sites are connected to the datacenter via 1GB links with an average latency of 6 ms RTT.

What is the minimum RPO the administrator can achieve for this environment?

A. 0 minutes

B. 15 minutes

C. 1 hour

D. 6 hours

Show Answer
Questions 2

An administrator needs to initiate a new VDI project within a couple of months. Prism Central reports there are no storage resources to accommodate such workloads.

The administrator sees many powered-off VMs and has the authority to delete test VMs powered off at least for 30 days. Test VMs belong to the Test category.

Using Prism Central, which steps are required to identify the correct VMs to be deleted?

A. Use Capacity Runway to filter by Test and Powered-off VMs

B. Filter VMs list, choose Test category and Inactive under Efficiency

C. Create a new Scenario selecting Test VMs. filter by uptime

D. Create a new Project selecting Test VMs, sorting by power state

Show Answer
Questions 3

A customer has a four-node cluster and is using Volume Groups to provide storage services to a SQL cluster. In the event of a CVM failure in the cluster, what is the expected IO path of the volume group's iSCSI targets?

A. vDisk directed at failure CVM are redirected to Data Services IP until CVM is reconnected

B. vDisk directed to CVM that failed to disconnect and will not reconnect without manual intervention

C. vDisk directed to failed CVM are redirected to another CVM and automatically reconnect

D. vDisk directed at failed CVM will disconnect and reconnect when the failed CVM comes back online

Show Answer
Questions 4

An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.

A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.

Which step should the administrator use to initiate the project?

A. Enable Nutanix Flow at the Prism Central Level

B. Manually disable CVM network Segmentation

C. Convert storage only nodes into vSphere nodes

D. Enable Jumbo Frames to accommodate network frames

Show Answer
Questions 5

An administrator inherits a new Nutanix environment and logs in to a CVM to check the network configuration. The configuration is as follows:

Which action should the administrator take to improve network performance?

A. Configure VLAN tagging both on br0 and br1 and their physical interfaces.

B. Add eth0 and eth1 to the br0-up bond

C. Configure balance-sib or balance-tcp mode for br0-up if switch configuration allows

D. Remove one 10 Gbs interface from br0-up to make sure all 10 Gbs can be used.

Show Answer

Viewing Page 1 of 3 pages. Download PDF or Software version with 107 questions