C9010-251 Exam Questions & Answers

Exam Code: C9010-251

Exam Name: Power Systems with POWER8 Scale-out Technical Sales Skills V1

Updated: Apr 21, 2024

Q&As: 156

At Passcerty.com, we pride ourselves on the comprehensive nature of our C9010-251 exam dumps, designed meticulously to encompass all key topics and nuances you might encounter during the real examination. Regular updates are a cornerstone of our service, ensuring that our dedicated users always have their hands on the most recent and relevant Q&A dumps. Behind every meticulously curated question and answer lies the hard work of our seasoned team of experts, who bring years of experience and knowledge into crafting these premium materials. And while we are invested in offering top-notch content, we also believe in empowering our community. As a token of our commitment to your success, we're delighted to offer a substantial portion of our resources for free practice. We invite you to make the most of the following content, and wish you every success in your endeavors.


Download Free IBM C9010-251 Demo

Experience Passcerty.com exam material in PDF version.
Simply submit your e-mail address below to get started with our PDF real exam demo of your IBM C9010-251 exam.

Instant download
Latest update demo according to real exam

*Email Address

* Our demo shows only a few questions from your selected exam for evaluating purposes

Free IBM C9010-251 Dumps

Practice These Free Questions and Answers to Pass the IBM Certified Technical Sales Specialist Exam

Questions 1

A customer has two Power 570 servers that need to be replaced to accommodate company growth.

The first server runs a transactional workload with high server usage during the day (8am-8pm)

The second server runs analytic queries based on the transactional data during the night (10pm-6am).

A technical sizing analysis determined that each server would require (18) POWERS 3.52GHz cores and

160GB RAM, considering the needed growth.

What would be the most cost-efficient way to satisfy the customer needs?

A. (1) new Power S824 with 24 cores and 384GB and DLPAR CPU resources among LPARs

B. (1) new Power 770 with 36 active cores and 384GB active, virtualized with capped LPARs

C. (1) new Power S824 with 36 cores and 384GB, virtualized with capped LPARs.

D. (2) new Power S824 with 20 cores and 192GB RAM each.

Show Answer
Questions 2

A customer has a requirement for four partitions, each with 1TB of Storage They want to put a new S814 machine in. but only have 4U available in the rack.

Which POWER8 option accomplishes this?

A. Order a 6-core machine with the Expanded Function backplane with (18) SFF SAS 283GB drives, all the drives owned by VlO Server and then allocated to each partition.

B. Order a 6-core machine with the Split backplane, with each side having (4) 283GB drives for two partitions and two sets of EJ03 Disk Controllers each connected to a 5887 with (4) 283GB disks each for the other two partitions.

C. Order a4-core machine with the Expanded Function backplane with (10) SFF SAS 571GB drives, all the drives owned by VlO Server and then allocated to each partition.

D. Order a 4-core machine with the Split backplane with (18) SFF SAS 283GB drives, all the drives owned by VlO Server and then allocated to each partition.

Show Answer
Questions 3

Which tape backup option is supported for migration from a POWER6 520 with a SCSI attached external LTO-3 tape drive to a POWER8 S814, and is read compatible with LTO-3?

A. Migrate the SCSI adapter to the S814 and attach it to an existing LTO-3 tape drive.

B. Add an SAS adapter and external LTO-5 tape drive.

C. Add an internal LTO-4 tape drive in the CEC.

D. Add an SAS adapter and external LTO-6 tape drive.

Show Answer
Questions 4

A customer has a partitioned system running IBM i and Domino. The customer is considering a new system to replace the existing system and wants to add a Web Sphere application and an AIX application.

Which of the following will assist in sizing the new system?

A. Performance Management (PM) for Power Systems

B. Workload Estimator (WLE)

C. Snap Shot

D. System Planning Tool (SPT)

Show Answer
Questions 5

Which statement is true regarding Power Systems being positioned as an open platform?

A. OpenStack management allows for a single HMC to provide centralized management across the whole private cloud.

B. CAPI allows clients to consolidate multiplatform workloads by attaching other manufacturer processors (like Intel or Oracle) on the servers.

C. PowerKVM allows clients to standardize on a single open source virtualization technology among RISC and x86 servers.

D. Linux on Power allows clients to transparently migrate workloads from Linux x86 servers via Live Partition Mobility.

Show Answer

Viewing Page 1 of 3 pages. Download PDF or Software version with 156 questions